Tuesday, December 4, 2012

Actors

As we are filming the band at the live performance we decided to use the band throughout the whole production. As the band live near by it makes it more convenient to make plans as to when we need them for the other aspects of the plans for the production. The band have personally been wanting to make a music video but they had difficulty creating a music video around their school and meeting up. What with us working with the band, it can be used as an advantage for us to be able to use their equipment and going to the gig but working with the band can be hard work due to us having to work with them and taking on board their ideas to go towards the music video that they want to represent them as the band. When we were planning to meet for filming in the October half term it proved difficulty due to the band members going to different schools and plans that they had already going on. So most of our filming was done when we could in the October half term and at weekends when everybody was free.


The band has an odd sense of humour which shows in these images that they have taken personally and one of our images that we took whilst filming.
 
 
 
 
 The four members in the band are;
Gavin Jones
Adam Weisz
Loui Parsons
Jamie Cameron

Monday, December 3, 2012

Story Boards and Shot Lists

This is a rough idea as to how our production will roughly look when we start to edit the footage from filming. These are the main concepts that we want in our production and will then see what footage we have also got to help build up the production to last the whole song.















Shot 1-Mid/Long shot of band members at eye line.
Location of woods, positioned between two trees-performance shot
Shot 2—Point of view shot, low angled
Location of Mama Liz walking down the stairs into the gig
Shot 3—Mid shot into close up of the lead singer-zoom
Location of the gig, performance shot
Shot 4—Mid shot, point of view, tracking
Location of Bourne Woods where the band members walk through the trees
Shot 5-High angled point of view shot
Location of Bourne woods, looking up into the trees
Shot 6-mid/close up shot, slightly angled upwards
Location of gig, Gavin singing live performance shot
Shot 7-Long shot, at eye line
Location Bourne Woods with all the band members playing there instruments within the trees
Shot 8-Long shot, at eye line
Location Bourne woods, all band member positioned in a row for the Ok Go scene, between two trees
Shot 9—close up of bass playing
Location of the gig , Louis playing his bass guitar-performance shot
Shot 10-Long shot, at eye line
Location of Bourne woods, return back to the Ok GO 
Shot 11—close up of the drums to the side of the stage
Location of the gig with Adam playing the drums—live performance shot
Shot 12—long shot at eyeline
Location of Bourne Woods with all the band members performing the routine
Shot 13—mid shot 
Location of Bourne Woods, the band members walk along the path past the camera
Shot 14—close up of the guitar playing at a low angle looking up
Location of the gig Jamie playing his guitar-performance shot
Shot 15—long shot at a high angle
Location at the back of the gig with the audience right in front with the stage in the foreground
Shot 16—close up singing, low angled upwards
Location the gig with Gav singing into the microphone—performance shot
Shot 17—Long shot of the band members standing on the bench
Location of Bourne Woods, in a clearing with a bench, the band is dancing and playing there individual instruments
Shot 18—close up shot of bass playing
Location of the gig with the bass playing
Shot 19—long shot at eye level
Location of Bourne Woods, the band members perform the Ok Go inspired routine
Shot 20—close up, positioned upwards 
Location of the gig with Gav singing 
Shot 21—Long shot at eye level
Location a clearing within Bourne Woods—band members are standing playing there instruments
Shot 22--Long shot at eye level
Location of the woods with the band positioned in a line for another part of the routine
Shot 23—Close up of drumming
Location of the gig with a side view of the stage—close up of Adam playing the drums
Shot 24—mid shot of people dancing
Location of the gig with the camera positioned on the stage with the view of the audience dancing
Shot 25—close up of the instrument
Location of the gig with a upwards angle to the instrument
Shot 26—Long shot at eye level
Location of Bourne Woods within the tree, they pop out—one by one
Shot 27—close up shot of the guitar
Location at the gig with Jamie playing his guitar
Shot 30—close up of the singing
Location at the gig with Gav singing and playing the guitar—performance shot
Shot 31—long shot of the bonfire and dancing
Location at Thurbly primary school field the fire is in front of the dancers and the camera is positioned behind them—narrative shot
Shot 32—Close up shot of fire
Location of the Primary school field of the bonfire 
Shot 33—mid shot of fireworks
Location of the primary school field with the fireworks in the night sky.
Shot 34—back to close up of the fire
Shot 35—back to the mid shot of the fireworks.
This shot list is a basis as to what we wanted to do with our production but when it comes to editing we may put in more shots if we feel it looks better and whether we think it links better to the genre of the music.

Tuesday, November 13, 2012

Mood Board


This is a mood board of what sort of elements we hope to include in our promo. The top left hand corner shows potential costume ideas and some dance move that the band could do in the OK GO section of the promo which links to the bottom right hand corner. In the bottom right hand corner it shows images from the OK GO End Love music promo which we hope to use as inspiration for dance routines and the band sped up in the routine or with slight stop motion elements. The bottom left hand corner shows images of fireworks and a live performance. And in the top right hand corner show images that the band have already got of them messing about and on a stage.

Location 3 - OK Go Inspired Segment

Our location for where we are going to do our OK Go inspired aspect of the production will be done at Bourne Woods/Pillar Woods where the band will do a slight dance routine then mess about around the woods and the park in the woods. By using this location the group can mess about without being disturbed as it is a large area where not many people will be about as other people will be spread out in the woods. In the OK Go - End Love video there are parts that involves trees which we thought we could use as an aspect for our production.


Wednesday, November 7, 2012

Location 2 - The bonfire/fireworks

Considering the time when we are filming our productions, it is around bonfire night which is perfect for us to be able to get some shots of fireworks, bonfires and people messing about around the bonfire which means that we can get the footage first hand and within the time of when we should be filming.

The location that we are planning to shoot at is Lawrence Park in Thurlby which is a local village just outside of Bourne. Lawrence Park is part of the Thurlby Community Primary School. It is a large playing field where they put the bonfire in towards the far side of it so that people can fill out the rest of the playing field.

The Thurlby Fireworks is actually on bonfire night itself (5th November), they have a fireworks display, bonfire and sparklers which we wish to incorporate into our final production.

Location 1 - The Live Performance

Luckily the band had already arranged to do a gig at a local venue. The venue is Mama Liz's/Voodoo Lounge. The Voodoo Lounge (where the band is performing) is an underground venue that is full sound proofed and is attached to Mama Liz's. The Voodoo lounge in Stamford is a very small location but allows the bands that perform there to be able to get used to doing a live performance in front of people even if it is just to their friends/family. These images are from the Voodoo Lounge website of previous bands that have performed there but it shows the location and the stage set up and the lighting that the venue provide.
The band had an advertisement on the Website saying what other bands are there performing with them and telling people how much it will be for them to enter the venue on the night or in advance. This location can help towards our performance aspect of the production as the band already have the instruments, the venue already has lighting and the stage, all we need to do now is film at the live performance which we did so on the 28th October 2012.

This screen shot shows that the band invited people that they know through the social networking site Facebook. This meant that the band that the band could have people pre pay for their tickets and also publicise the bands gig. Within the description the band suggest about how the band will be dressing up in Fancy Dress Halloween costumes. We got in contact with the band to see if their faces will be seen and the band replied to say that their faces would be seen but they may have some basic face paints on. The band had organised this gig before we decided to use them as our choice of song for our music promo which was lucky as we could then film the band live and then work with them throughout the rest of what we are planning to do for the promo. We hope that with these costumes that they are wearing for their gig that we can use them in the rest of the production if it is possible to keep a link throughout the whole promo.

Stop Motion

We did some tests of how stop motions is done. We filmed/used the burst mode on a camera to take multiple photos in one go.
 
The first test that me did was each move done on burst/sports mode which worked well but the two within the test moved or me and another member from the group moved the camera or tripod. When we looked back at the footage we realised that Emily and Lucy were stood before hand for a bit and afterwards just standing still which meant that we had to edit most of it out and it became time consuming.
On test two we put it onto the same mode but did the routine all through  instead of stoping and starting so it only took 2 shots to do the full routine. This was more successful so when we come to do our stop motion part of the production we will do it in this sort of way.